HealthITGuy's Blog

The evolving world of healthcare IT!

Clean Cabling: Backside of a Production UCS Chassis

Fully cabled chassis, note the open and clean airflow when so little cabling is involved.

I had blogged how clean the installation of a chassis is with needing only 4 cables for I/O and 4 power cables.  Via twitter someone asked for a pic of this and I realized I did not have one posted.  I have added this pic to my Picasa page that contains about 50 UCS pictures (it is the last one).

http://picasaweb.google.com/healthITGuy68/CiscoUCSPictures#

Note how open the airflow is when you only have a few cables to deal with.  You can see they were paying attention to this detail on the fabric extenders and where the power plugs into; all of the openings.

You can also see I am only using 2 of the 4 possible ports in the fabric extenders (FEX).  The options being 1, 2 or 4 connections per each FEX.

March 19, 2010 Posted by | Cisco UCS | | Leave a Comment

   

Follow

Get every new post delivered to your Inbox.